CAPABILITIES
Baseline Development and Project Control
- Implementation Strategy and Clean-up Assumptions
- Configuration Control
- Development of Work Breakdown Structures
- Cost Estimating
- Project Controls Engineer Support
- Earned Value Measurement
- Earned Value Management System Training
- Prioritization and Sequencing
- Development of Integrated Critical Path Schedules
- Risk and Opportunity Management
- Preparation of DOE Order 413.3 Compliant Documents
- Project Controls System Development and Maintenance
Regulatory Strategy and Document Preparation
- Development of Compliance and Documentation Strategies
- Preparation of CERCLA Documents
- Engineering Evaluation/Cost Analysis (EE/CA)
- Remedial Investigation/Feasibility Study (RI/FS)
- Proposed Plans and Records of Decision
- Sampling and Analysis Plans
- Risk Assessments
- Waste Handling Plans
- Remedial and Removal Action Work Plans
- Remedial Design Reports
- Completion Reports
- Remedial and Removal Action Reports
Environmental and Facility Sampling and Characterization
- Soil/sediment Sampling (in house Geoprobe™ equipment)
- Monitoring well design and installation
- Surface and Groundwater Sampling
- Environmental Monitoring
- Characterization for Waste Acceptance Criteria
- Characterization of Nuclear Facilities and Process Equipment (D&D
Support)
- Radiological and Geophysical Surveys
- Geographic Information System Mapping and Databases
- Analytical Coordination and Data Management
Remedial Actions
- Work Package Preparation
- Underground Tank Excavations
- Soil Remediation
- Groundwater Containment and Cut-off Walls
- Design of groundwater pump and treat systems
- Verification/Confirmation Sampling